The HDI Range allows daily working time up to 24 hours. HDI equipment has two stages including a primary combustion chamber, with a hot-hearth construction, which ensures the total destruction of the waste. An integrated post-combustion system completes the process, to guarantee maximum gas turbulence, and ignite the gases which remained unburnt during the first combustion.
SOLID WASTE LOADING
The HDI series incinerators are designed for manual or automatic loading with hydraulic assistance. Loads of all types of waste are done through a front access, which reduces heat loss during loading.
LIQUID WASTE LOADING
The option for automatic loading by pneumatic assisted injectors, of liquid, muddy or pasty waste, allows loading of waste safely. One or more injectors are directed towards the center of the combustion chamber.
MANUAL DE-ASHING
Ash removal can be manual or automatic (optional). In manual mode, this involves emptying the tank or the bucket provided for this purpose, using a forklift. This can be done completely automatically.